Vermont

Mound Bed Width Requirements – Guidance and Acceptable Solutions

In the State of Vermont, Advanced Enviro-Septic® (AES) and Enviro-Septic® (ES) mound bed width guidance requirements are available in the PDF “Interim Guidance for Presby Enviro-Septic® Pipe.

Certification Training Classes

The Vermont Advanced Enviro-Septic® and Enviro-Septic® approval requires all designers and installers to be certified. Presby Environmental highly recommends all those involved in the permitting process also attend. To view the class schedule and certification options click on the ‘Training and Certification’ tab above.

Manuals and Approvals

Please download the 2014 Edition of the Vermont Design and Installation Manual for proper installation and design of the Advanced Enviro-Septic® and Enviro-Septic® Wastewater Treatment Systems.

Vermont Installation and Design Manual – Edition Changes Oct 2013

System Installation Form

Vermont law requires installers to submit a “System Installation Form” to Presby Environmental for all AES and ES installations. This form is included in the 2010 Advanced Enviro-Septic® and Enviro-Septic® Manual above.